The Frame work has been completed & the shower lined with 6mm Fibrous/Cement board & then water proofed. Once the cubicle was completed all of the necessary holes for the plumbing were installed, then the Tiling was started.
All of the wall panels were braced to reduce vibration before the tiles were glued in place, The tiles were set on Quality rubberized cement & the grouting has been done with SikaFlex to add strength.