The remaining work on the shower is only the fitting of the combined vent, Fan & Light unit, ( the ceiling is yet to be painted & the refitting of the original light but these I will leave until the remainder of the painting is done,)
Category The Shower
The final stages of the Shower build.
The Shower has now been completed with the exception of the roof vent unit, using SikaFlex for the grouting was a major pain due to it tacking off quickly & causing problems when reworking at joints. I use a lot of this product & find it excellent but not for this use.

Once the grouting was completed the Shower screen was installed & all of the plumbing fittings reinstalled.
The Shower unit late in the build process.
The Frame work has been completed & the shower lined with 6mm Fibrous/Cement board & then water proofed. Once the cubicle was completed all of the necessary holes for the plumbing were installed, then the Tiling was started.
All of the wall panels were braced to reduce vibration before the tiles were glued in place, The tiles were set on Quality rubberized cement & the grouting has been done with SikaFlex to add strength.
Shower unit start of Installation.
The shower has been started, once the floor had been replaced after completion of the work for the Gray water tank & the rear stabilizer system the shower base & frame work was erected in place. the shower base was fitted into a hole created in the floor to allow it to be set below the existing floor level.